Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-644-14&P
2. At the transmission end of the assembly,
of 25-30 lb-ft DRY THREADS, or 20-24 lb-ft
remove the capscrews that attach the cross
LUBRICATED THREADS.
assembly to the output flange.
2. Position transmission end of universal joint so
3. At the differential end of the assembly, remove
holes in cross assembly align with holes in
the capscrews that attach the cross assembly to
output flange.  Insert capscrews and tighten
the differential carrier flange.
them to specified torque of 25-30 lb-ft DRY
THREADS,  or  20-24  lb-ft  LUBRICATED
4. Remove the entire universal joint assembly from
THREADS.
the lift truck.
NOTE
E. INSTALLATION
Make certain ALL CAPSCREWS are
tightened to SPECIFIED TORQUE.
1. Position the differential end of the universal joint
so the holes in the cross assembly align with the
3. Remove blocks supporting the lift truck and
holes in the differential carrier flange.  Insert
lower the truck to the floor.
capscrews and tighten them to specified torque
2-62

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business