Click here to make tpub.com your Home Page

Page Title: REASSEMBLY
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-638-24&P
3-30. HYDRAULIC LIFT SYSTEM MAINTENANCE (cont)
d. Rotation CylinderAssembly (cont).
ITEM
ACTION
REMARKS
LOCATION
STEP
REASSEMBLY (cont)
CAUTION
Use extreme care not to damage rings or seals when performing
following step.
17
Cylinder (27)
a. Rod (24), gland as-
Install as an
sembly (17) and
assembly
piston assembly (12)
Position and
Tighten to 100-150 pounds foot torque
b. Gland assembly (17)
tighten
18
Rotation cylin-
Two lubrication fittings
Install
der assembly
(9)
(8)
TESTING
19
Rotation cylin-
Cylinder port (port op-
a. Connect hydrau-
lic hose to port
der assembly
posite rod end)
(hose must have
a 7/16-20 fitting
on end)
b. Connect other end
of hose to test
hydraulic pump
20
a. Start pump and Rod should extend smoothly from cylinder
Test hydraulic
pump
apply hydraulic
oil under pres-
sure (2000 PSI)
to rotation cyl-
inder assembly
b. Continue operat-
ing pump until
rod is complete-
ly extended
from cylin-
der; hold
until step 21
below is
completed
3-237

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business