|
|
TM 10-3930-638-24&P
3-20. AXLES AND DIFFERENTIAL CARRIER ASSEMBLIES MAINTENANCE (cont)
c. Front Axle Differential Carrier Assembly.
c. Axle housing inspection
a. Removal
This task covers:
d. Installation
b. Axle housing cleaning
INITIAL SETUP
EQUIPMENT CONDITION
TOOLS
Condition Description
Paragraph
NSN 4910-00-754-0654
No. 1 Common Organiza-
Vehicle parked on level surface, engine
tional Maintenance Tool Kit
off, wheels blocked, and parking brake
Roller Jack, 1/4 ton capacity
applied.
Jack Stands, 4 ton capacity
Shipping lock pin installed.
Container, 4 gallon capacity
Front drive shaft assembly disconnected
Hard Wooden Blocks (2).
from front axle assembly differential
6 by 6 by 18 inches
companion yoke.
Brake line removed.
2-43b, step 5
MATERIALS/PARTS
Cleaning solvent P-D-680
Clean cloths
Sealer (FSCM 78500 P/N 1199Q2981)
Moisture free compressed air
Crocus cloth
REMARKS
ACTION
ITEM
STEP
LOCATION
REMOVAL
Place under drain
Drain lubricant into 4 gallon container
1
a. Container
Axle housing,
plug
bottom
Remove and drain
b. Drain plug
lubricant
Remove
Discard lubricant
c. Container
3-142
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |