|
|
TM 10-3930-638-24&P
3-20. AXLES AND DIFFERENTIAL CARRIER ASSEMBLIES MAINTENANCE (cont)
b. Rear Axle Assembly.
a. Removal
This task covers:
b. installation
INITIAL SETUP
EQUIPMENT CONDITION
TOOLS
Condition Description
Paragraph
NSN 4910-00-754-0654
No. 1 Common Organiza-
Vehicle parked on level surface, engine
tional Maintenance Tool Kit
off, front wheels blocked, and parking
Jack Stands, 4 ton capacity (2)
brake applied.
Chain Hoist, 10 ton capacity
Shipping lock pin installed.
Roller Jack, one ton capacity
Rear drive shaft assembly disconnected
Hard Wooden Blocks (2),
from rear axle assembly differential
6 by 6 by 18 inches
companion yoke.
Rear chassis raised (use chain hoist) and
MATERIALS/PARTS
securely blocked (use jack stands).
Hose (FSCM 81343 P/N SAE30R2TYPE1-1-41D)
Rear wheels and tires removed.
Brake hoses, lines and fittings discon-
nected from rear axle assembly housing
and wheel cylinders.
3-140
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |