|
|
TM 10-3930-638-24&P
2-28. INSTRUMENT PANEL MAINTENANCE (cont)
c. Ignition Switch and Circuit Breaker.
c. Inspection
This task covers: a. Removal
d. Installation
b. Cleaning
INITIAL SETUP
EQUIPMENT CONDITION
TOOLS
NSN 4910-00-754-0654
Paragraph
Condition Description
No. 1 Common Organiza-
Engine off.
tional Maintenance Tool Kit
Battery ground cable disconnected.
Noise baffle mat removed.
MATERIALS/PARTS
Cleaning solvent P-D-680
Clean cloths
Tie strap
REMARKS
ACTION
ITEM
STEP
LOCATION
REMOVAL
1
Instrument panel, a. Circuit breaker (1)
From wire leads (2)
Unplug and
right of steering
remove
column
From IGNITION switch (5)
b. Harness connector (3)
Grasp and pull
c. Hex nut (4)
Support 1GNITION switch (5)
Unscrew and
remove
From instrument panel
d. IGNITION switch (5)
Lower and
remove
e. Tie strap (6)
From harness wire
Cut and remove
Change 2
2-133
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |