|
|
TM 10-3930-634-12
CAREFULLY DRIVE UP TO POSITION WHERE LOAD IS TO BE DEPOSITED.
STEP 1:
DEPRESS INCHING PEDAL.
STEP 2:
PUSH FORK EXTENSION CONTROL LEVER FORWARD TO EXTEND FORKS
STEP 3:
LONGITUDINALLY.
PUSH FORK TILT CONTROL LEVER FORWARD TO TILT CARRIAGE TO VERTICAL POSITION.
STEP 4:
IF LOAD IS TO BE DEPOSITED ON GROUND LEVEL, PUSH FORK LIFT CONTROL LEVER
STEP 5:
FORWARD AND ALLOW LOAD TO LOWER SLOWLY TO RESTING PLACE. CONTINUE TO
LOWER FORKS UNTIL THEY CAN BE EASILY WITHDRAWN FROM PALLET. THEN PROCEED
WITH STEP 10.
IF LOAD IS TO BE DEPOSITED ON A TIERED STACK, PULL FORK LIFT CONTROL LEVER
STEP 6:
BACK UNTIL LOAD REACHES DESIRED HEIGHT ABOVE TIER, THEN PROCEED WITH STEPS
7 THROUGH 10.
RELEASE INCHING PEDAL AB0UT HALFWAY AND INCH TRUCK FORWARD UNTIL LOAD
STEP 7:
IS ABOVE ITS RESTING PLACE.
DEPRESS INCHING PEDAL.
STEP 8:
PUSH FORK LIFT CONTROL LEVER FORWARD AND LOWER LOAD CAREFULLY TO ITS
STEP 9:
RESTING PLACE. CONTINUE TO LOWER FORKS UNTIL THEY CAN BE EASILY WITHDRAWN
FROM PALLET.
PLACE FORWARD-NEUTRAL-REVERSE CONTROL LEVER IN REVERSE AND RELEASE lNCH-
STEP 10:
ING PEDAL.
TA031833
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |