Click here to make tpub.com your Home Page

Page Title: Cleaning and Inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-632-34
inner rail (22) and outer rail (23). Position the outer rail
WARNING
on the inner rail so that the inner rail rollers slide in the
outer rail track. Move the outer rail along until it contacts
Dry cleaning solvent, P-D-680, used to clean
the stop pads. It must move freely, without binding or
parts is potentially dangerous to personnel and
drag. If binding or dragging is present, check welds or
property.  Avoid repeated and prolonged skin
bends made during repair; correct the cause of drag or
contact.
Do not use near open flame or
excessive heat. Flash point of solvent is 100 F.
bind.
b. Turn the inner and outer rail assembly over
- 138 F. (39 C. - 59 C.).
and block the outer rail so that it is level and the trunnion
brackets are clear of the ground.  Slide the outer rail
3-4. Cleaning and Inspection
down until the rollers stop it; support the outer rail so that
it is level. Use a pry bar to move the inner rail fully to one
a. Clean all metal parts of the mast assembly,
side. Maximum clearance between rails and rollers on
except the rollers, with cleaning solvent P-D-680. Wipe
the side forced apart is 1/32 inch.  Check for this
off dirt, dust, and grease and oil deposits.
clearance on the full length of the inner rail for the outer
b. Clean the rollers by wiping with a cloth
rail roller, and down to 20 inches below the outer rail
dampened in cleaning solvent P-D-680.
rollers for the inner rail rollers. Add or remove shims
c.  Inspect all metal parts for wear, distortion, or
behind the rollers to maintain this maximum clearance.
other damage; replace defective parts.
Check again for clearance; readjust if necessary.
d. Inspect the trunnion bushings for  wear,
scoring, distortion, or other damage; replace bushings if
NOTE
damaged.
The inner rail is made with a slight taper so that the
e. Inspect stop pads for wear, cracks, distortion,
bottom is wider than the top.  Make the outer rail
or other damage; replace damaged stop pads.
roller adjustments with the inner rail in the fully
f.  Inspect inner and outer rail assemblies for
extended  position  or  the  rail  will  bind  when
cracks, breaks or distortion; repair inner and outer rails
reassembled.
by welding or straightening. Replace rails if they cannot
be repaired.
3-6. Installation
3-5. Reassembly
Install the mast assembly (para 2-6b ).
Refer to figure 3-1 and reassemble the mast
assembly. Note the following:
a. Place the shims (8) and two rollers (7) on the
3-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business