c. Now touch the second lead of the meter to all
the individual circuits from that point until the ground has
been located. After the ground has been located and
terminals on the contactor panel, instrument panel,
corrected, connect all wires and/or cables securely to
static panel, and control valve pump switches.
the proper terminals. Then check for ground at battery
Resistance readings must be greater than 50,000 ohms.
d. Touch the second lead of the meter to all
receptacle poles to make certain the ground has been
eliminated.
current carrying parts of the contactors, motor terminals,
and static panel. Resistance readings must be greater
9-7. Power Switch Module Test
than 50,000 ohms.
Note
e. If a noticably low resistance reading or zero
To perform the following, refer to figure 9-1,
resistance is obtained at any terminal, remove the wire
wiring diagram for location of terminals.
or cable from that terminal. Check the resistance of
a. Disconnect the main truck harness from static
wires or cables and continue through
panel plug P2, (fig. 9-6).
9-10
|