|
|
(3) Replace unserviceable parts with ser-
viceable parts.
a.
Removal. Remove the front propeller shaft
assemble front propeller shaft.
b.
front
propeller shaft.
c.
Cleaning and Inspection.
5 5 - 6 0 ft. lbs.
(1) Clean all parts.
(2) Inspect all parts for cracks, abrasions,
scoring, and looseness.
8
Dust cap
1
Speeder assembly
9
Tube assembly
2
Screw
10
Lubrication fitting
3
Lockwire
11
Retainer
4
Lubrication fitting
12
Dust shield
5
Slip yoke
13
Lockwasher
6
Washer
14
Bolt
7 Felt
(3) Replace any unserviceable part with a
serviceable part.
reassemble the rear propeller shaft.
e. Installation. Install the rear propeller shaft
disassemble the rear propeller shaft.
c. Cleaning and Inspection.
screws 55-60 ft. lbs.
(1) Clean all parts.
(2) Inspect all parts for cracks, breaks, ex-
cessive wear, or any other damage.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |