|
|
TM 10-3930-242-12
MAINTENANCE ALLOCATION CHART - CONTINUED
(6)
(4)
(5)
(3)
(2)
(1)
Tools
Maintenance category
and
Maintenance
Group
Remarks
C
F
D
eqpt
H
function
O
Component/Assembly
number
STEERING CONTINUED
14
Mechanical Steering Gear
1401
Assembly Continued
Replace
1.0
2,3
Steering Gear Assembly
1.0
2,3
Repair
2,3
Inspect
0.1
Link, Drag
3,7,9
Replace
0.6
1.0
2,3
Repair
Hydraulic Pump
1410
7,12
0.5
Test
Pump, Rear Steering
3,7,10,
2.0
Replace
12
3,7,10,
Repair
2.0
12
Inspect
0.1
Hcsses, Lines, Fittings
1411
Replace
2,3
0.5
2,3
0.5
Repair
Hydraulic Cylinder
1412
0.1
Inspect
Cylinder, Steering
1.0
3,7,10
Replace
1.0
3,7,10
Repair
Steering System Valves
1414
0.5
3,7
Adjust
Valve, Steering
Replace
3,5,7,10
2.0
3,5,7,10
3.0
Repair
15
FRAME, TOWING ATTACH-
MENTS AND DRAWBARS
3
Inspect
0.2
1501
Frame Assembly
2,3,9
3.0
Replace
0.1
Inspect
Roll Over Protective
1,5,7,9
Replace
2.0
Structure
3,5,7,9
Repair
1.0
1502
1.5
2,3
Replace
Counterweights
1503
Pintles and Towing
Attachments
Pintle
3
0.2
Inspect
2,3
2.0
Replace
BODY, CAB, AND HOOD
18
1801
Body, Cab and Hood Assemblies
0.1
3
Inspect
Body Covers and Panels
1,2,3
Replace
0.1
3
Inspect
Cockpit
.0.1
Replace
1,2,3
16.0
Repair
3,4,5,7,
4.0
9,11
Change 1
D-11
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |