|
|
TM 10-3930-673-34
16-13. INTERMEDIATE BOOM REPLACEMENT/REPAIR (CONT)
NOTE
Perform steps 7 and 8 for each of two
wear pads.
(7)
At inside of outer boom (4), position three
shims (8), spacer (7), three inserts (6), and
wear pad (5).
(8)
Apply sealing compound to threads of three
screws (1).
(9)
Secure wear pad (5) to outer boom (4) with
three washers (3), new lockwashers (2), and
screws (1). Tighten screws to 30 lb-ft (40.67
Nm).
TR01349
(10) Push intermediate boom (9) into outer boom
(4).
(11) Remove lifting straps supporting
intermediate boom and move other forklift
and overhead lifting device away from work
area.
(12) Position ropes at rear of boom down through intermediate boom.
NOTE
Follow-on Maintenance: Install inner boom (Para 16-12).
END OF TASK
16-72
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |