Click here to make tpub.com your Home Page

Page Title: INNER BOOM REPLACEMENT/REPAIR - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-673-34
TR01691
(56) Pull bottom of divider (80) assembly to the rear to expose lower screw (81) and locknut
(82).
NOTE
Note quantity and position of washers and spacers for installation.
(57) Remove locknut (82), lower screw (81), washers (83), and spacers (84) from divider (80)
assembly. Discard locknut.
(58) Mark position of three hydraulic hoses (65) and electrical cable (59) and pull hoses and
electrical cable out from rear of outer boom (40).
(59) Install upper screw (76) and locknut (75) back into pulley bracket (79) assembly.
NOTE
A clean container may be used to receive extend chain.
(60) Pull extend chain (85) out from rear of outer boom (40).
(61) Position another forklift vehicle in front of and facing vehicle.
(62) Using lifting straps or chains, secure front of inner boom to carriage of other forklift
vehicle.
NOTE
Chains or straps are used to prevent intermediate boom from being pulled out when
inner boom is removed.
(63) Using lifting straps or chains, secure intermediate boom to outer boom.
Change 1
16-65

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business