|
|
TM 10-3930-673-20-2
18-29. BOOM HOIST CYLINDERS REPLACEMENT (CONT)
NOTE
If removing one boom hoist cylinder have assistant signal operator when cylinder is fully retracted.
If removing both boom hoist cylinders, note that one cylinder will fully retract before other cylinder
begins to retract. Have assistant signal operator when both cylinders are fully retracted.
(6)
Start engine and run at full throttle (TM 10-3930-673-10).
(7)
Using boom hoist joystick, fully retract boom hoist cylinder (4).
(8)
Stop engine (TM 10-3930-673-10).
(9)
Using suitable lifting device, lower boom hoist cylinder (4) until cylinder is resting on wooden board placed
on vehicle deck (5).
(10)
Tag, mark, and remove two hoses (9 and 10)
from fittings (11 and 12).
(11)
Remove boom hoist cylinder lower pivot pin
(13) from frame (14).
(a)
Remove locknut (15) and screw (16) from
lower pivot pin (13) and frame (14).
Discard locknut.
(b)
Remove lower pivot pin (13) from frame
(14) and boom hoist cylinder (4).
(12)
Move lifting device to cylinder (4) balance
point and remove cylinder from vehicle.
b. Installation.
(1)
Using suitable lifting device, lower boom
TR00843
hoist cylinder (4) until cylinder is resting on
board placed on vehicle deck (5).
(2)
Apply anti-seize compound on lower pivot pin (13).
(3)
Align cylinder base lower mounting holes and install lower pivot pin (13) in frame (14) and boom hoist
cylinder (4) with screw (16) and locknut (15).
(4)
Install two hoses (9 and 10) on fittings (11 and 12).
18-160
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |