|
|
TM 10-3930-673-20-2
(12) Remove attachment hoses (250 through 252)
from fittings (253 through 255) on rear boom
bulkhead (256).
NOTE
Remove tie wraps as necessary.
(a)
Remove protective sleeve (257) from
three hoses (250 through 252).
(b)
Tag, mark, and remove three hoses (250
through 252) from fittings (253 through
255).
(13) Remove hoses (258 through 260) and fittings
(261 through 263) from front boom bulkhead
(264) and tubes (265 through 267).
(a)
Tag, mark, and remove three hoses (258
through 260) from fittings (261 through
263).
(b)
Remove three fittings (261 through 263).
TR00773
(c)
Remove three hoses (258 through 260)
from three tubes (265 through 267).
261
262
259
264
258
263
260
265
266
267
18-139
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |