|
|
TM 10-3930-673-20-2
18-6. ATTACHMENT CONTROL VALVE REPLACEMENT (CONT)
(4)
Connect eight connectors (6) and gaskets (7)
on attachment valve (8).
8
(a)
Install eight gaskets (7) and connectors
(6) on valve (8).
(b)
Tighten eight screws (9).
7
6
9
TR00830
(5)
Install cover (1) on boom (2).
(a)
Position cover (1) on boom (2).
(b)
Install four washers (4), locknuts (3) on
studs (5).
NOTE
Follow-on Maintenance
Connect negative battery cable
Purge air from hydraulic system by cycling
each attachment function five times (TM 10-
2
3930-673-10).
1
5
4
3
END OF TASK
TR00831
18-42
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |