|
|
TM 10-3930-673-20-2
8-46. BATTERY BOX AND COVER REPLACEMENT (CONT)
b. Installation.
7
6
(1)
Install battery box (10) on four studs (15) on
cab (16) with four washers (14) and locknuts
(13).
(2)
Install conduit (12) in battery box (10).
9
(3)
Install hardware (parts 1 through 9) on
5
8
4
battery box (10) and battery box cover (11).
14
11
16
(a)
Install two rubber hooks (9) on brackets
15
13
(6) with two screws (8) and locknuts (7).
3
(b)
Install two brackets (6) on battery box
cover (12) with two screws (5) and
locknuts (4).
(c)
Install two catch clamps (2) on battery
12
box (11) with four screws (3) and
locknuts (1).
2
3
1
10
NOTE
TR00548
Follow-on Maintenance:
Install slave receptacle (Para 8-52).
Install shunt (Para 8-30).
Install batteries (Para 8-42).
Install cables and terminals (Para 8-44).
END OF TASK
8-144
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |