|
|
TM 10-3930-673-20-2
8-30. STE/ICE SHUNT REPLACEMENT (CONT)
(3)
Install two STE/ICE electrical wires (10 and
11) on STE/ICE shunt (3).
(a)
Install STE/ICE electrical wire (11) on
terminal (18) of STE/ICE shunt (3) with
lockwasher (17), and screw (16).
(b)
Install electrical wire (10) on terminal
(15) of STE/ICE shunt (3) with washer
(14), lockwasher (13), and screw (12).
TR00539
(4)
Install ground cable (2) and negative battery
cable (1) on STE/ICE shunt (3).
(a)
Install ground cable (2) on terminal (9) of
STE/ICE shunt (3) with lockwasher (8)
and screw (7).
(b)
Install negative battery cable (1) on
terminal (6) of STE/ICE shunt (3) with
lockwasher (5) and screw (4).
NOTE
Follow-on Maintenance: Install batteries (Para
END OF TASK
TR00538
8-86
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |