Click here to make tpub.com your Home Page

Page Title: Test
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-673-20
8-23. CONSOLE MOUNTED RELAYS TEST/REPLACEMENT (CONT)
(2)
Tag and mark four electrical wires (4
9
8
10
through 7) on relay (8).
4
(3)
Remove four nuts (9), lockwashers (10), and
electrical wires (4 through 7) from relay (8).
7
Discard lockwashers.
5
6
9
10
9
10
10
9
TR00345
(4)
Test relay (8) for proper solenoid operation.
16
15
(a)
Apply 24 VDC to terminals (11 and 12).
(b)
Listen for "click" when voltage is
8
applied. If no "click" is heard, replace
relay (perform Removal and
Installation sections of this paragraph).
(c)
If "click" is heard, go on to Step (5)
14
below.
(5)
Test relay (8) for continuity.
12
13
11
(a)
Apply 24 VDC to terminals (11 and 12).
(b)
Multimeter should show continuity across
terminals (13 and 14).
(c)
Multimeter should show no continuity across terminals (15 and 16) (if applicable).
(d)
Remove 24 volts DC from terminals (11 and 12).
(e)
Multimeter should show no continuity across terminals (13 and 14).
(f)
Multimeter should show continuity across terminals (15 and 16).
(g)
If continuity requirements are not met in Steps (5)(a) through (5)(f), replace relay (perform Removal and
Installation sections of this paragraph).
(h)
If continuity requirements are met, perform Steps (6) through (9) below.
8-70

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business