|
|
TM 10-3930-673-20-1
Maintenance Allocation Chart for All Terrain Lifter, Army System (ATLAS) (Continued)
(4)
(1)
(2)
(3)
(5)
(6)
Maintenance Level
FIELD
SUSTAINMENT
Unit
DS
GS
Depot
Group
Maintenance
Tools and
Number Component/Assembly
Function
C
O
F
H
D
Equipment Remarks
Tandem Gear Pump
Test
0.5
16
Replace
1.5
2
Repair
2.0
5,16
Piston Pump
Test
0.5
17
Replace
1.0
2
2402
Control Valves
0.5
2
Main Control Valve
Adjust
2.0
2
Assembly
Replace
5
Repair
2.0
Attachment Control Valve Replace
1.0
2
Assembly
Repair
2.0
5
Priority Valve
Replace
0.5
2
Relief Valve, Frame Tilt/
Test
0.5
16
Brakes
Replace
0.5
2
Shuttle Valve
Replace
0.5
2
Frame Tilt Valve
Replace
0.5
2
Boom Cylinder Flow Con- Replace
0.4
2
trol Valve
2404
Tilt Cylinder:
Frame Tilt Cylinder
Service
0.3
3
Replace
0.7
2
Repair
1.0
1.0
5,13
Carriage Tilt Cylinder
Service
0.3
3
Replace
2.0
2
Repair
1.0
1.0
5,13
2405
Attachment:
0.1
Carriage Assembly
Inspect
0.3
3
Service
0.1
2
Replace
2.0
5
Repair
Forks
Inspect
0.1
Replace
1.0
2
Repair
1.0
Fork Bushings
Inspect
0.1
Replace
0.5
3
B-18
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |