|
|
TM 10-3930-673-20-1
Maintenance Allocation Chart for All Terrain Lifter, Army System (ATLAS) (Continued)
(4)
(1)
(2)
(3)
(5)
(6)
Maintenance Level
FIELD
SUSTAINMENT
Unit
DS
GS
Depot
Group
Maintenance
Tools and
C
O
F
H
D
Number Component/Assembly
Function
Equipment Remarks
0613
Wiring Harnesses:
Cab Wiring Harness
Test
0.5
3
Replace
8.0
2
Repair
2.5
5
Main Wiring Harness
Inspect
0.1
Test
0.5
3
Replace
8.0
2
Repair
2.0
5
Boom Electrical Cable
Test
0.5
3
Replace
4.0
2
Repair
0.5
3
STE/ICE-R Harness
Test
0.5
3
Replace
4.0
2
Repair
0.5
3
Electric Joystick Harness
Test
0.5
3
Replace
1.0
2
Repair
0.5
3
Slave Receptacle
Replace
0.3
2
07
TRANSMISSION
0705
Transmission Shifting
Components:
Transmission Shifter
Adjust
1.0
1
Replace
2.5
2
Transmission Cables
Replace
2.0
2
Transmission Disconnect
Adjust
1.0
2
Pedal
Replace
2.0
2
Transmission Disconnect
Replace
2.0
2
Master Cylinder
Repair
0.3
P
0708
Torque Converter
Test
0.2
5
Replace
8.0
2,5
Repair
14.0
2,5
Change 1
B-11
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |