|
|
TM 10-3930-673-20-1
CONTINUITY TEST
J1-37
(1) Disconnect negative battery cable from
negative side of battery (Para 8-42).
J1-36
(2) Set multimeter to ohms.
(3) Disconnect connector J1 from
J1-35
connector P1.
P1-37
(4) Disconnect connector J4 from
connector P4.
P1-36
(5) Connect multimeter positive lead (+) to
connector J4-P and J4-R where wire
P1-35
CONNECTOR
J
64 and 65 connect.
1
(6) Connect multimeter negative lead () to
connector P1-35 and P1-36.
(a) If continuity is present, go to
Step 14 of this fault.
(b) If continuity is not present, repair
CONNECTOR P1
wire 64 or 65 and/or connector P1,
connector J4 (Para 8-49),
(Para 8-50).
CONNECTOR
J
1
CONNECTOR
P
1
CONTINUITY TEST
J4-N
(1) Disconnect negative battery cable from
negative side of battery (Para 8-42).
(2) Set multimeter to ohms.
J4-R
(3) Disconnect connector J1 from
J4-P
connector P1.
CONNECTOR J4
(4) Connect multimeter positive lead (+) to
wire 64 and 65 where wire 64 and 65
CONNECTOR
P
connect to electrical junction box.
(5) Connect multimeter negative lead () to
4
connector P4-R and P4-P.
(a) If continuity is present, replace
auto-level switch (Para 8-20).
(b) If continuity is not present, repair
wire 64 or 65 and/or connector J1
(Para 8-49), (Para 8-50).
(6) Connect connector J1 to connector P1.
(7) Connect connector J4 to connector P4.
TR01754
2-483
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |