TM 10-3930-673-20-1
CONTINUITY TEST
(1) Set multimeter to ohms.
WIRE 9
(2) Disconnect connector J2 from
connector P2.
(3) Connect multimeter positive lead (+) to
wire 9 at starter motor solenoid.
(4) Connect multimeter negative lead () to
connector P2-1.
(a) If continuity is present, go to
Step 16 of this fault.
(b) If continuity is not present, repair
wire 9 or connector P2 (Para 8-49).
STARTER SOLENOID
J2-1
P2-1
CONNECTOR J2
CONNECTOR P2
CONTINUITY TEST
(1) Set multimeter to ohms.
(2) Disconnect connector J2 from
connector P2.
(3) Connect multimeter positive lead (+) to
wire 9 at circuit breaker CB6.
(4) Connect multimeter negative lead () to
connector J2-1.
(a) If continuity is present, service or
replace battery (Para 8-42).
(b) If continuity is not present, Repair
wire 9 or connector J2 (Para 8-48).
(5) Install access panel and four screws.
(6) Connect negative battery cable to
negative side of battery.
(7) Install battery cover (Para 8-42).
WIRE 9
CIRCUIT BREAKER CB6
TR01712
2-177
|