|
|
TM 10-3930-673-20-1
P2-1
CONNECTOR P2
CONNECTOR
J
CONTINUITY TEST
2
(1) Set multimeter to ohms.
CONNECTOR P2
(2) Connect multimeter positive lead (+) to
starter motor solenoid where wire 9
connects.
(3) Connect multimeter negative lead () to
connector P2-1.
(a) If continuity is present, service or
replace battery (Para 8-42).
(b) If continuity is not present, repair
wire 9 or connector P2 (Para 8-49).
(4) Connect connector J2 to connector P2.
(5) Install battery cover (Para 8-42).
WIRE 9
STARTER SOLENOID
TR01104
2-85
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |