Click here to make tpub.com your Home Page

Page Title: Unloading the ATLAS-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-673-10
(4)
Remove chains from carriage and counterweight.
(5)
Unlock the 463L pallet from the C-130 pallet rail locking system.
(6)
Roll 463L pallet (with counterweight and carriages) toward ramp of the C-130.
(7)
With the rear ramp of the C-130 in horizontal position, place 463L pallet on rear ramp with lateral (108 inch) side
perpendicular to aircraft.
(8)
Drive the ATLAS to the 463L pallet, approaching from the side of the pallet where the 10K carriage is shored.
(9)
Install the 10K carriage on the ATLAS (Para 2-12) and back up the ATLAS.
WARNING
When the ATLAS is being operated without counterweight, care must be taken to avoid tipping the
vehicle over. Boom extension must be kept at a minimum. Failure to comply could result in serious
injury or death to personnel.
(10)
Using the ATLAS with 10K carriage installed, pick up the 463L pallet (with counterweight and 6K carriage).
(11)
Position 463L pallet on stable level ground in suitable area.
(12)
Drive the ATLAS to the 463L pallet, approaching from the 108 inch side of the pallet where the counterweight and
10K shoring is stacked.
WARNING
Counterweight assembly weighs 5,800 lbs. Keep out from underneath counterweight assembly. Do not
stick fingers or hands in holes for counterweight pins. Failure to comply could result in injury or
death to personnel.
(13)
Using the ATLAS with 10K carriage installed, pick the counterweight up through the lifting eyes, and place on
stable level ground in suitable area.
(14)
Install counterweight assembly on the ATLAS (Para 2-14).
(15)
Drive the ATLAS toward the 463L pallet, approaching from the side of the pallet where the 6K carriage and
shoring is stacked.
(16)
Using the ATLAS with10K carriage installed, pick the 6K carriage up and place on stable level ground in suitable
area.
(17)
Remove shoring from 463L pallet.
Change 1
F-11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business