Click here to make tpub.com your Home Page

Page Title: Loading the ATLAS-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-673-10
NOTE
The ATLAS boom extension may be used to roll 463L pallet forward off the ramp and onto the
aircraft where loading personnel can roll the pallet to the far end of the aircraft.
If the C-130 aircraft is not level, the 463L pallet shall be attached to the winch and guided by the
winch to the front of the aircraft.
(24)
Roll 463L pallet (with counterweight and both carriages) toward front of the C-130.
NOTE
The rear of the 463L pallet should not cover the 9th row of tiedown rings on the floor of the C-130
aircraft.
(25)
Position the front end of the 463L pallet at fuselage station FS317 (approximate location of the 4th row of tiedown
rings on the floor.)
(26)
Lock the 463L pallet into position using the C-130 pallet rail locking system.
CAUTION
Do not allow chaining to scratch, nick, or dent carriage fork shaft or side shift cylinder rods. Failure to
follow this caution will result in equipment damage.
(27)
Restrain the 6K carriage, refer to Figure F-13.
(a)
Chain the 6K carriage around the hole in the left carriage restraint bracket to the floor tiedown ring at 3C,
and around the hole in the right carriage restraint bracket to the floor tiedown ring at 3E.
(b)
Chain the 6K carriage around the right side plate to the 6th ring on the right side restraining rail assembly
(6A), and around the left side plate to the 6th ring on the left side restraining rail assembly (6A).
(28)
Restrain the counterweight.
(a)
Attach a chain at the 3rd ring on the left side of the restraining rail assembly (3G), through the counterweight
lifting eye, and to the 9th ring on the left side of the restraining rail assembly (9G).
(b)
Attach a chain at the 3rd ring on the right side of the restraining rail assembly (3A), through the
counterweight lifting eye, and to the 9th ring on the right side of the restraining rail assembly (9A).
(29)
Restrain the 10K carriage.
(a)
Attach a chain to the left and right side backrests and to the 5th tiedown ring of the restraining rail assembly
(5G and 5A) on the left and right sides.
Change 1
F-9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business