|
|
TM 10-3930-673-10
(10)
Drive the ATLAS to the 463L pallet, approaching from the 108 inch side of the pallet where the counterweight and
10K shoring is stacked.
(11)
Position counterweight over the 463L pallet with the counterweight centered fore and aft.
NOTE
Counterweight should also be centered between left and right sides of 463L pallet.
Space must be allowed to position 10K fork tines between outer edge of 6K fork tines and inner
edge of counterweight blocks.
(12)
Lower the counterweight onto the shoring and 463L pallet and drive ATLAS away from pallet to the aircraft.
(13)
Place support blocks under the heels of the 6K fork tines to prevent tipping during transport.
(14)
Using the ATLAS with 10K carriage installed, approach the 463L pallet (with counterweight and 6K carriage)
from the side opposite the shored 6K carriage.
(15)
Using the ATLAS with 10K carriage installed, pick up the 463L pallet (with counterweight and 6K carriage).
Change 1
F-7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |