Click here to make tpub.com your Home Page

Page Title: Loading the ATLAS-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-3930-673-10
(10)
Drive the ATLAS to the 463L pallet, approaching from the 108 inch side of the pallet where the counterweight and
10K shoring is stacked.
(11)
Position counterweight over the 463L pallet with the counterweight centered fore and aft.
NOTE
Counterweight should also be centered between left and right sides of 463L pallet.
Space must be allowed to position 10K fork tines between outer edge of 6K fork tines and inner
edge of counterweight blocks.
(12)
Lower the counterweight onto the shoring and 463L pallet and drive ATLAS away from pallet to the aircraft.
(13)
Place support blocks under the heels of the 6K fork tines to prevent tipping during transport.
(14)
Using the ATLAS with 10K carriage installed, approach the 463L pallet (with counterweight and 6K carriage)
from the side opposite the shored 6K carriage.
(15)
Using the ATLAS with 10K carriage installed, pick up the 463L pallet (with counterweight and 6K carriage).
Change 1
F-7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business