| |
TM 10-3930-671-24
WARNING
Overhead guard weighs 195 lb (88 Kg). Ensure suitable lifting device is attached properly to
overhead guard prior to removal to prevent injury to personnel.
(6)
Attach a suitable lifting device to overhead guard (4) and apply lifting tension.
(7)
Remove eight screws (5) and four plates (6) from overhead guard (4).
(8)
Remove overhead guard (4) from forklift (7).
b.
Installation.
(1)
Using a suitable lifting device, install overhead guard (4) on forklift (7) with eight screws (5) and plates (6). Tighten
screws 50-55 Ib-ft (65-75 Nm)
(2)
Install intake tube (Para 3-18, Step (1)[fl - (1)[i]).
(3)
Connect three connectors (1, 2, and 3) as tagged and marked during removal.
(4)
Install instrument panel (Para 3-36).
(5)
Install flood lights, as required (Para 3-24).
END OF TASK
3-96
|