| |
TM 10-3930-671-24
(c)
To install engine oil pressure sending unit (9), proceed as follows:
1
Apply sealing compound to threads of engine oil pressure sending unit (9).
2
Install engine oil pressure sending unit (9) on fitting (13).
3
Install three wires (12) on engine oil pressure sending unit (9) with three screws (11).
4
Install cover (10) on engine oil pressure sending unit (9).
(d)
To install transmission oil temperature sending unit (1), proceed as follows:
1
Apply sealing compound to threads of transmission oil temperature sending unit (1).
2
Install transmission oil temperature sending unit (1) on transmission (8).
3
Move cover (2) and install insulating washer (7) and wire (6) on transmission oil temperature sending unit
(1) with washer (5), lockwasher (4), and nut (3).
(e)
Install floor panels on forklift (Para 3-36).
(f)
Connect batteries (Para 3-25).
3-62
|