| |
TM 10-3930-671-24
(2)
Installation.
NOTE
Install all wires on switches as tagged and marked prior to removal.
(a)
To install master power switch (14), proceed as follows:
1
Install master power switch (14) on forklift (12) with switchplate (25), lockwasher (24), nut (23), lever (22),
and screw (21). Tighten nuts securely.
2
Install two wires (20) on master power switch (14) with two lockwashers (19) and nuts (18).
3
Install two wires (17) on master power switch (14) with two lockwashers (16) and nuts (15).
(b)
To install glow plug switch (10), proceed as follows:
1
Install two wires (13) on glow plug switch (10).
2
Install glow plug switch (10) in forklift (12) with button (11). Tighten button securely.
3-49
|