| |
TM 10-3930-669-34
15-9. PIVOT AND SHIFT ASSEMBLY REPLACEMENT/REPAIR.
This task covers:
a.
Removal
c.
Cleaning/Inspection
e.
Installation
b.
Disassembly
d.
Reassembly
INITIAL SETUP
Tools and Special Tools
Materials/Parts
Tool Kit, General Mechanics: Automotive
Nut (2) (Item 37, Appendix B)
(Item 1, Appendix E)
Gasket (2)
Lifting Chain, (Item 5, Appendix E)
Jack Kit, Hydraulic 20 Ton
Personal Required
(Item 5, Appendix E)
Two
Jack, Hydraulic 50 Ton (Item 5, Appendix E)
Wrench Set, Socket 3/4 "dr"
Equipment Condition
(Item 5, Appendix E)
Engine OFF (TM 10-3930-669-10)
Torque Wrench 0-600 lb ft
Parking brake applied (TM 10-3930-669-10)
(Item 5, Appendix E)
Wheels chocked (TM 10-3930-669-10)
Portable Grinder/Sander
Shift assembly centered on vehicle
(Item 5, Appendix E)
(TM 10-3930-669-10)
Lubricant Packer Bearing
Side shift rod scraper removed
(Item 5, Appendix E)
(TM 10-3930-669-20)
Arc Welding Machine (Item 6, Appendix E)
Batteries disconnected (TM 10-3930-669-20)
Spanner Wrench (Item 19, Appendix E)
Pivot cylinder removed (TM 10-3930-669-20)
Lifting Device, Minimum Capacity 4,000 lbs
Mast removed (Para 13-2)
(1814 kg)
15-55
|