| |
TM 10-3930-669-34
15-3.
STACK VALVE REPLACEMENT/REPAIR.
This task covers:
a.
Removal
c.
Cleaning/Inspection
e.
Installation
b.
Disassembly
d.
Assembly
INITIAL SETUP
Tools and Special Tools
Materials/Parts - Continued
Tool Kit, General Mechanics: Automotive
Packing, Preformed
(Item 1, Appendix E)
Packing, Preformed
Pan, Drain (Item 11, Appendix E)
Packing, Preformed
Packing, Preformed (2)
Materials/Parts
Packing, Preformed (2)
Cloth, Lint-free (Item 6, Appendix B)
Packing, Preformed (2)
Oil, Hydraulic (Item 15, Appendix B)
Packing, Preformed (6)
Rags, Wiping (Item 19, Appendix B)
Packing, Preformed (8)
Solvent, Dry-cleaning (Item 20, Appendix B)
Tags, Identification (Item 21, Appendix B)
Equipment Condition
Packing, Preformed
Engine OFF (TM 10-3930-669-10)
Packing, Preformed
Parking brake applied (TM 10-3930-669-10)
Packing, Preformed
Wheels chocked (TM 10-3930-669-10)
Packing, Preformed
Batteries removed (TM 10-3930-669-20)
Packing, Preformed
Battery tray removed (TM 10-3930-669-20)
Packing, Preformed
Filter tray removed (TM 10-3930-669-20)
Packing, Preformed
Hydraulic pressure relieved
Packing, Preformed
(TM 10-3930-669-20)
Packing, Preformed
Hydraulic reservoir drained
Packing, Preformed
(TM 10-3930-669-20)
Packing, Preformed
15-12
|