| |
TM 10-3930-669-34
13-3. CARRIAGE REPLACEMENT/REPAIR (CONT).
(27)
Install two primary chains (3) on anchors (4) with two pins (2) and four cotter pins (1).
NOTE
Follow-on Maintenance:
Install mast (Para 13-2).
Adjust mast (TM 10-3930-669-20).
Adjust carriage chains (TM 10-3930-669-20).
END OF TASK
13-32
|