| |
TM 10-3930-669-34
NOTE
Position two secondary chains through center rail prior to center rail installation.
A pry bar may be required to position center rail in outer rail.
(5)
Install two shims (73) and rollers (71) on outer rail (61).
(6)
Install two shims (72) and rollers (70) on center rail (58).
WARNING
Center rail weighs 361 lbs (164 kg). Attach suitable lifting device prior to installation to
prevent possible injury to personnel.
All personnel must stand clear during lifting operations. A swinging or shifting load may
cause injury or death to personnel.
(7)
Install center rail (58) in outer rail (61).
13-17
|