TM 10-3930-669-34 9-2. PLANETARY HUB REPLACEMENT/REPAIR. This task covers: a. Removal c. Cleaning/Inspection e. Installation b. Disassembly d. Assembly INITIAL SETUP Tools and Special Tools Materials /Parts Shop Equipment, Automotive Maint and Base Plate (Item 6, Appendix C) Repair: Supp.  1 (Item 3, Appendix E) Compound, Sealing (Item 24, Appendix B) Tool Kit, General Mechanic’s: Automotive Compound, Corrosion Preventive (Item 1, Appendix E) (Item 7, Appendix B) Depth Gauge (Item 5, Appendix E) Lubricating Oil (Item 15, Appendix B) Lifting Device Rags, Wiping (Item 19, Appendix B) Micrometer (Item 5, Appendix E) Solvent, Dry-cleaning (Item 20, Appendix B) Press, 60 Ton (Item 5, Appendix E) Seal (3) Puller (Item 31, Appendix E) Seal Wrench, Torque (0 to 175 lb-ft [0-237 N.m]) Seal (Item 5, Appendix E) Seal Wrench, Torque (0 to 600 lb-ft [0-814 N.m]) Washer, Seal (Item 5, Appendix E) Equipment Condition Drive axle removed (Para 10-2) a. Removal. WARNING Front  axle  weighs  608  lbs  (276   kg). Attach  suitable  lifting  device  prior  to removal    or    installation    to    prevent possible injury to personnel. NOTE Right  planetary  gear  carrier  removal is shown.   Left  planetary  gear  carrier removal is similar. (1) Remove  four  screws  (1),  planetary  gear  carrier (2),  and  seal  (3)  from  wheel  hub  (4).    Discard seal. (2) Remove   plug   (5)   and   seal   washer   (6)   from planetary gear carrier (2).  Discard seal washer. 9-2

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business