| |
TM 10-3930-669-34
b.
Installation.
(1) Apply a light coat of grease to intermediate ring
(14) and position on cylinder head (6).
(2) Position cylinder head (6) on cylinder (19).
(3) Apply a light coat of oil to threads of four screws
(12) and install screws and washers (13) in
cylinder head (6). Preload four screws to 30 lb-ft
(40 Nm). Tighten screws (see Appendix D).
(4) Install two preformed packings (11) and plugs
(10) in cylinder head (6). Tighten plugs to 59 to
66 lb-ft (80-90 Nm).
3-39
|