| |
TM 103930-669-20
9-2. DRIVESHAFT REPLACEMENT/REPAIR.
This task covers:
a. Removal
c.
Cleaning/Inspection
e. Installation
b. Disassembly d. Assembly
INITIAL SETUP
Tools and Special Tools
Tool Kit, General Mechanic's: Automotive
(Item 1, Appendix B)
Wrench, Torque (0-60 N·m)
(Item 12, Appendix B)
Materials/Parts
Cloth, Lint-Free (Item 6, Appendix C)
Grease, Bearing (Item 14, Appendix C)
Rags, Wiping (Item 19, Appendix C)
Materials/Parts - Continued
Solvent, Dry-cleaning (Item 20, Appendix C)
Clips (6)
Washer, Lock (4)
Washer, Lock (4)
Equipment Condition
Engine OFF (TM 10-3930-669-10)
Wheels chocked (TM 10-3930-669-10)
Drive axle oil pump removed (Para10-3)
a. Removal.
NOTE
For removal of driveshaft, elevate front of forklift.
(1)
Remove four nuts (1), lock washers (2), screws (3), and driveshaft disk flange (4) from brake disc (5). Discard
lock washers.
(2)
Remove four screws (6), lock washers (7), two clamps (8), and driveshaft (9) from transmission flange (10).
Discard lock washers.
9-2
|