TM 10-3930-669-10
2-10. OPERATING PROCEDURES (CONT).
NOTE
The load face nearest the operator should be very close to the vertical rack member and in
view of the operator.
You will notice mast assembly counterclockwise pivot and left-hand shift action at the same
time. These functions will not be synchronized and one function may stop before the other.
(8)
Shift the loaded mast assembly to the left until the load is more than halfway out. When the load is more
than halfway out, begin moving in reverse at a slow (creep) speed and pull the mast assembly pivot/shift
joystick (Table 2-1, 16) rearward and to the left.
(9)
When the load is partially shifted to the left and at an angle of approximately 45 degrees, stop the left-hand
shifting motion.
(10)
With the forklift still moving in reverse at a slow (creep) speed, continue to pivot the load counterclockwise
until the far corner of the load is clear of the opening. Continue to pivot load while shifting mast assembly
back to the right until load is centered in front of the truck.
(11)
Lower the load to approximately 12 inches (305 mm) above the ground. Refer to Step e. for driving
procedures.
2-32
|