| |
TM 10-3930-664-24
13. REMOVE ROLLERS (90, 94) AND ROLLERTM 10-
3930-664-24 GUIDES (96).
a.
Remove drive chain rollers (90) from top of
intermediate rail (91) by removing screws (92)
and roller pins (93).
b.
Remove four rollers (94) and shims (95) from
intermediate rail (91).
c.
Remove mainlift hose roller guides (96) from
bottom of intermediate rail (91) by removing
bolts (97) and washers (98, 99).
B.
CLEANING
Clean mast assembly components in accordance with
paragraph 1-24.
C.
INSPECTION
a.
Inspect mast assembly components in accordance
with paragraph 1-24.
b.
Inspect wear pads (53, 65, 67, 71) for uneven or
excessive wear. Check for small semi-circle on face
of pad. If semi-circle has worn away, replace pad.
D.
REPAIR
Repair of the mast assembly consists of removal and
replacement of defective, deformed, or damaged
components and worn pads.
E.
ASSEMBLY
1.
INSTALL ROLLERS (90 94) AND ROLLER GUIDES
(96).
a.
Install mainlift hose roller guides (96) onto
bottom of intermediate rail (91) using bolts (97)
and washers (98, 99).
b.
Install four rollers (94) and shims (95) onto
intermediate rail (91).
c.
Install drive chain rollers (90) onto top of
intermediate rail (91) using screws (92) and
roller pins (93).
4-113
|