TM 10-3930-664-24 6. Determine    quantity    of    shims    (12)    required    to preload roller bearings as follows: a. Install lower pivot pin (9) into steering case (11). Do not install shims (12). b. Install  four  bolts  (6)  and  washers  (7).    Tighten bolts. c. Using feeler  gauge, measure gap between pivot pin  (9)  and  steering  case  (11).    Choose  correct quantity of shims (12) to eliminate gap. d. Remove bolts (6), washers (7), and pivot pin (9). 7. Install  seal  (13)  and  bearing  cone  (8)  onto  lower pivot pin (9). 8. Install  lower  pivot  pin  (9)  and  required  number  of shim(s) (12). 9. Install grease fitting (10). 10. Install four bolts (6) and washers (7) to secure lower pivot pin (9).  Torque bolts to 50 to 55 ft-lbs.  (67 to 75 N•m). 11.    Repeat steps 7, 8, 10 for upper pivot pin (9). 12.    Insert tie rod (1)  into  steering  case  (2)  and  secure using nut (4).  Tighten nut to 192 to 215 ft-lbs.  (260 to 290 N•m). 13.    Loosen  nut  (4)  slightly  until  holes  in  nut  align  with holes in tie rod (1).  Install new cotter pin (3). FOLLOW-ON MAINTENANCE: Install   wheel   assembly   (para.      2-113) Adjust brakes (para.  2-107) END OF TASK 4-99

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business