| |
TM 10-3930-664-24
4-22. FIRST AND SECOND CLUTCH GEAR REPLACEMENT
This task covers: Removal, Cleaning, Inspection, and Installation
INITIAL SETUP:
Tools and Test Equipment:
Equipment Condition:
General Mechanics Tool Kit (1, App. E)
Clutch assemblies removed
Retaining Ring Pliers (24, App. E)
para. 4-20)
Soft Head Hammer (23, App. E)
Puller Kit (26, App. E)
Feeler Gage (21, App. E)
Materials / Parts:
Grease (10, App. C)
Piston Ring, Item 1 (2 ea.)
Seal, Item 25 (1 ea.)
Seal, Item 26 (1 ea.)
Seal, Item 49 (1 ea.)
Seal, Item 50 (1 ea.)
A. REMOVAL
1.
Remove piston rings (1) from shaft (2) and
discard.
2.
Using pliers, remove snap ring (3) from ring
groove (4).
3.
Using a bearing puller, remove bearing (5) from
shaft (2).
4.
Remove outer thrust washer (6), bearing (7),
inner thrust washer (8), and bearings (9, 10).
4-53
|