TM 10-3930-664-24 B.  CLEANING Clean output shaft assembly components in accordance with paragraph 1-24. C.  INSPECTION Inspect output shaft assembly components in accordance with paragraph 1-24. D.  INSTALLATION 1. Apply a light coat of permatex #2 to O.D.  of oil seal  (29).    Press  oil  seal  into  seal  sleeve  (28). Seal must be flush with one side of sleeve.  Lip of seal must be in. 2. Install new O-ring (30) onto seal sleeve (28). 3. Install   snap   ring   (24)   into   transmission   case. Install bearing (27) against snap ring. 4. Position seal sleeve  (28)  into  transmission  case with   recessed   portion   of   seal   facing   bearing. Install snap ring (23). 5. Place  output  gear  (26)  into  transmission.    Long hub of gear must face front of case. 6. Install  rear  output  flange  (25)  into  transmission. Align   splines   on   flange   shaft   with   splines   on output gear (26). 7. Using pliers, install locating ring (32) into groove on output flange (25). 8. Position  flange  rings  (20,  22)  and  shift  hub  (21) onto output flange (25).  Install snap ring (19). 9. Position  shift  fork  (16)  in  hub  on  output  shaft. Insert fork rod (18) through oil seal and align with fork. 10. Install  shift  fork  to  shift  rail  lockscrew  (15)  and tighten. 11. ball  (14),  spring  (13),  and  disconnect  pin  (12) into transmission. 12. Install  new  O-ring  (31)  onto  plug  (11).    Install plug into transmission and tighten securely. 4-51

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business