| |
-
TM 10-3930-664-24
14.
Lower sideshift carrier (3). Remove lifting sling
from sideshift carrier and install onto inner rail of
mast assembly (1).
15.
Lift mast assembly (1) and remove jack stands
from under freelift cylinder mount base (2).
16.
Lower mast assembly (1) and remove lifting
sling.
FOLLOW-ON MAINTENANCE:
Install carriage assembly (para. 3-65)
Service mast assembly (para. 2-154)
Service carriage tilt cylinders (para. 2-150)
Adjust freelift chain (para. 2-155)
END OF TASK
3-223
|