| |
TM 10-3930-664-24
13.
Release left tilt cylinder (22) from mast clevis
(23) by removing roll pins (25) and pin (24).
14.
Repeat step 12 for right tilt cylinder.
WARNING
Mast
assembly
is
heavy
and
awkward. Enlist the help of an aide
when removing to prevent injury to
personnel
and
damage
to
components. Ensure lifting sling is
securely attached to lifting eyes and
taut.
15.
Remove mast assembly (26) from frame bracket
(27) by removing screws (28), rod ends (29),
pins (30), thrust bearings (31), and bushings
(32).
B. CLEANING
Clean mast assembly in accordance with paragraph 1-
24.
C. INSPECTION
Inspect mast assembly and related components in
accordance with paragraph 1-24.
D. INSTALLATION
WARNING
Mast
assembly
is
heavy
and
awkward. Enlist the help of an aide
when installing to prevent injury to
personnel
and
damage
to
components. Ensure lifting sling is
securely attached to lifting eyes.
1.
Attach lifting sling to mast assembly lifting eyes.
Position mast assembly for mounting to forklift
frame.
2.
Attach mast assembly (26) to frame bracket (27)
using screws (28), rod ends (29), pins (30),
thrust bearings (31), and bushings (32).
3.
Attach left tilt cylinder (22) to mast clevis (23)
using roll pins (25) and pin (24).
4.
Repeat step 3 for right tilt cylinder.
3-220
TM 10-3930-664-24
|