TM 10-3930-664-24 NOTE Place drain pan beneath hose assemblies    when    disconnecting    to catch fluids. 4. Tag and disconnect hose assemblies (5, 7) from intermediate    rail    manifold    (8).  Carefully  feed hose assemblies through chain roller. 5. Remove adapters (6) from which hose assemblies (5) were removed. 6. Loosen   two   freelift   chain   adjusting   nuts   (13). Remove freelift chain adjuster (14) from bracket (15) by removing nut (16). 7. Feed    freelift    chain    through    chain    roller    and remove with mast assembly. 8. Lower     sideshift     carrier     until     free     from     rail assembly.  Remove sideshift carrier. 9. Remove lifting sling from sideshift carrier.  Install sling on mast assembly lifting eyes in preparation for mast removal. 3-218

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business