| |
TM 10-3930-664-24
NOTE
Place
drain
pan
beneath
hose
assemblies when disconnecting to
catch fluids.
4.
Tag and disconnect hose assemblies (5, 7) from
intermediate rail manifold (8). Carefully feed
hose assemblies through chain roller.
5.
Remove
adapters
(6)
from
which
hose
assemblies (5) were removed.
6.
Loosen two freelift chain adjusting nuts (13).
Remove freelift chain adjuster (14) from bracket
(15) by removing nut (16).
7.
Feed freelift chain through chain roller and
remove with mast assembly.
8.
Lower sideshift carrier until free from rail
assembly. Remove sideshift carrier.
9.
Remove lifting sling from sideshift carrier. Install
sling
on
mast
assembly
lifting
eyes
in
preparation for mast removal.
3-218
|