| |
TM 10-3930-664-24
4.
Install upper carriage retainer (1) onto carriage
weldment (2) using screws (3), washers (4), and
nuts (5). Torque screws to 220 ft-lbs (297 Nm).
5.
Remove lift sling from carriage weldment (2).
Raise sideshift carrier and remove jack stands.
FOLLOW-ON MAINTENANCE:
Install forks (para. 2-157)
END OF TASK
3-216
|