TM 10-3930-664-24
3-65. CARRIAGE ASSEMBLY REPLACEMENT
This task covers: Removal, Cleaning, Inspection, and Installation
INITIAL SETUP:
Tools and Test Equipment:
Personnel Required:
General Mechanics Tool Kit (1, App. E)
2 Personnel
Jack Stand, 2 ea. (8, App. E)
Sling (4, App. E)
Soft Head Hammer (23, App. E)
Hoist (59, App. E)
Pliers, Snap Ring (24, App. E)
Reference:
Equipment Condition:
TM 10-3930-664-10
Forks removed (para. 2-157)
(Backrest also removed as part
of para. 2-157)
Materials / Parts:
Locknut, Item 12 (1 ea.)
A. REMOVAL
1.
Raise sideshift carrier and install two jacks
stands beneath carrier to secure during carriage
removal procedures.
2.
Remove
upper
carriage
retainer
(1)
from
carriage weldment (2) by removing screws (3),
washers (4), and nuts (5).
3-214
|