| |
TM 10-3930-664-24
4.
Install push rods (6) into valve tappet sockets.
Lubricate push rod sockets with oil.
CAUTION
Ensure rocker lever set screws
are completely backed out before
installing rocker arm assemblies.
5.
Install rocker arm assemblies (7) into cylinder head.
Ensure dowel ring in rocker support mates with
dowel bore.
6.
Lubricate threads and under heads of screws (8, 9).
Install screws.
7.
Torque screws (3, 4, 8) as follows using sequence
shown in figure:
a.
Torque all screws (3, 4, 8) to 66 ft-lbs (90 Nm).
b.
Retorque all screws (3, 4, 8) to 66 ft-lbs (90 Nm).
c.
Torque four screws (3) to 89 ft-lbs (120 Nm).
d.
Tighten all screws (3, 4, 8) an additional 1/4 turn.
8.
Torque screws (9) to 18 ft-lbs (24 Nm).
9.
Adjust rocker arm clearance in accordance with
paragraph 2-15.
FOLLOW-ON MAINTENANCE:
Install fuel injector nozzles
(para. 3-19)
Install rocker arm assemblies
(para. 3-12)
Install belt tensioner (para. 2-54)
Install fan hub (para. 2-52)
Install alternator (para. 2-55)
Install lifting bracket (para. 2-14).
Install fuel filter (para. 2-39)
Install intake manifold cover
(para. 2-24)
Install exhaust manifold (para. 2-23)
Service radiator (para. 2-46)
Service engine oil in accordance with
Lubrication Order
END OF TASK
3-35
|