| |
TM 10-3930-664-24
C.
INSPECTION
Inspect sight gage in accordance with paragraph 1-24.
Replace entire gage and attaching hardware if any
component is damaged or defective.
D.
INSTALLATION
CAUTION
Do not overtighten hollow bolts (7) as
damage to gage and O-rings can result.
Tighten only until gage fits snug against
reservoir wall.
1.
Install hydraulic reservoir sight gage (5) onto
hydraulic reservoir (6) using hollow bolts (7),
washers (8), and nuts (9).
2.
Install gasket (4).
3. Install cleanout cover (1) onto hydraulic reservoir (6)
using screw (2) and washer (3).
FOLLOW-ON MAINTENANCE:
Service
hydraulic
reservoir
in
accordance
with
Lubrication Order
END OF TASK
2-455
|