TM 10-3930-664-24
D. INSTALLATION
1.
Attach lifting sling and hoist to intermediate rail
(31). Raise rail enough to remove jack stands.
2.
Position
mainlift
cylinders
(37)
into
lower
brackets (34).
3.
Lower intermediate rail (31) until mainlift cylinder
rod ends fit inside upper mounts.
4.
Secure top of mainlift cylinders (37) to upper
mounts using screws (32) and nuts (33).
5.
Secure bottom of mainlift cylinders (37) to
brackets (34) using pins (36) and roll pins (35).
6.
Remove lifting sling and hoist.
7.
Install elbows (29) and new O-rings (30) into
bottom ports on mainlift cylinders (37). Connect
fittings (28) onto elbows.
8.
Install fittings (26), elbows (25), and new O-rings
(27) into top ports of mainlift cylinders (37).
9.
Connect tube assemblies (23, 24) to elbows
(25).
2-443
|