| |
TM 10-3930-664-24
8.
CONNECT HOSE ASSEMBLIES (88, 90, 93, 94,
96) WITH FITTINGS.
a.
Install tees (91) onto diverter valve (92).
Connect hose assemblies (93) to lower
tee (91).
b.
Connect hose assembly (90) to elbow (89)
and upper tee (91) on diverter valve (92).
c.
Connect hose assembly (94) to fitting on
bottom of sequence valve (95) and tee on
diverter valve (92).
d.
Connect hose assembly (96) to upper tee
(91) on diverter valve (92).
e.
Connect hose assembly (88) to tee (87)
and elbow (89).
9.
CONNECT
TUBING
(78,
79,
83)
WITH
FITTINGS.
a.
Connect tubing (79) to tee (87).
b.
Secure tubing (79) to rail brace using
screws (85) and clamps (86).
c.
Connect tubing (78) and hose assembly
(83) to tee (84). Hose assembly leads to
hydraulic tank.
d.
Install elbows (81) and new O-rings (82)
into top of main lift cylinders (80).
e.
Connect tubing (78, 79) to elbows (81).
2-430
|